12 Critical problems with product development

12 Critical problems with product development orthodoxy

1) Failure to correctly qualtify economics
2) Blindness to Queues
3) Worship of Efficiency
4) Hostility to Variability
5) Worship of Conformance
6) Institutionalization of Large batch sizes
7) Underutilization of Cadence
8) Managing timelines instead of Queues
9) Absence of WIP constraints
10) Inflexibility
11) Noneconimic flow control
12) Centralized control

Excerpt from Donald Reinertsen’s  book – Principles of Product Development Flow
Good book to understand  why and how lean and agile principles solve product development problems
http://www.celeritaspublishing.com/PDFS/ReinertsenFLOWChap1.pdf

Author: Tribhuwan

I am Tribhuwan Negi. I have been a technology evangelist and enthusiast having wide areas of interest in the field of software development and engineering. I have experience in architecting and designing enterprises applications, integration and middle-ware application solutions. I have worked on computational data grids(fabrics), distributed caching, data retrieval systems, complex event processing engines. I have also worked with CADCAM, process engineering and robotic simulations. I have lead teams on complete SDLC cycle. I have worked with start-ups and practiced agile software development. I work on different roles of developer, tech lead, engineering manager, software architect and scrum master. I have Bachelor and Masters Degree in Engineering from Indian Institute of Technology(IIT), Bombay.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: